brymaxservices.com
  • Home
  • Main Menu
    • About Us
    • Our Values
    • Capabilities Statement
    • Certifications
    • Executive Team
  • Our Services
    • HVAC
    • Design-build Engineering
    • BIM / 3D Modeling
    • Prefabrication
    • Maintenance
    • Consulting
    • Commissioning Services
    • Owner Representation
  • Notable Projects
    • Education experience
    • Healthcare Experience
    • Aviation Experience
    • Gaming Experience
    • Tenant Improvement
  • The BRYMAX promise
  • Careers with BRYMAX
  • BRYMAX News and events
  • Brymax gives back
  • More
    • Home
    • Main Menu
      • About Us
      • Our Values
      • Capabilities Statement
      • Certifications
      • Executive Team
    • Our Services
      • HVAC
      • Design-build Engineering
      • BIM / 3D Modeling
      • Prefabrication
      • Maintenance
      • Consulting
      • Commissioning Services
      • Owner Representation
    • Notable Projects
      • Education experience
      • Healthcare Experience
      • Aviation Experience
      • Gaming Experience
      • Tenant Improvement
    • The BRYMAX promise
    • Careers with BRYMAX
    • BRYMAX News and events
    • Brymax gives back
brymaxservices.com
  • Home
  • Main Menu
    • About Us
    • Our Values
    • Capabilities Statement
    • Certifications
    • Executive Team
  • Our Services
    • HVAC
    • Design-build Engineering
    • BIM / 3D Modeling
    • Prefabrication
    • Maintenance
    • Consulting
    • Commissioning Services
    • Owner Representation
  • Notable Projects
    • Education experience
    • Healthcare Experience
    • Aviation Experience
    • Gaming Experience
    • Tenant Improvement
  • The BRYMAX promise
  • Careers with BRYMAX
  • BRYMAX News and events
  • Brymax gives back

ALTERNATIVE CARE FACILITY - COVID WHITE MEMORIAL HOSPITAL

Los Angeles, CA  (2021)     


Project was a 90 bed Covid-19 emergency response alternate care facility.  


Structure was a Sprung Structure constructed at White Memorial Hospital in Los Angeles.  


Project consisted of (4) package AC DOAS Units, (4) main Exhaust fans with HEPA Filtration and pressure controls for Isolation rooms.  


Entire project was design and built in less than 56 days.

BRYMAX Construction Services Inc.

Serving the greater Los Angeles county since 2015

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept