brymaxservices.com
  • Home
  • Main Menu
    • About Us
    • Our Values
    • Capabilities Statement
    • Certifications
    • Executive Team
  • Our Services
    • HVAC
    • Design-build Engineering
    • BIM / 3D Modeling
    • Prefabrication
    • Maintenance
    • Consulting
    • Commissioning Services
    • Owner Representation
  • Notable Projects
    • Education experience
    • Healthcare Experience
    • Aviation Experience
    • Gaming Experience
    • Tenant Improvement
  • The BRYMAX promise
  • Careers with BRYMAX
  • BRYMAX News and events
  • Brymax gives back
  • More
    • Home
    • Main Menu
      • About Us
      • Our Values
      • Capabilities Statement
      • Certifications
      • Executive Team
    • Our Services
      • HVAC
      • Design-build Engineering
      • BIM / 3D Modeling
      • Prefabrication
      • Maintenance
      • Consulting
      • Commissioning Services
      • Owner Representation
    • Notable Projects
      • Education experience
      • Healthcare Experience
      • Aviation Experience
      • Gaming Experience
      • Tenant Improvement
    • The BRYMAX promise
    • Careers with BRYMAX
    • BRYMAX News and events
    • Brymax gives back
brymaxservices.com
  • Home
  • Main Menu
    • About Us
    • Our Values
    • Capabilities Statement
    • Certifications
    • Executive Team
  • Our Services
    • HVAC
    • Design-build Engineering
    • BIM / 3D Modeling
    • Prefabrication
    • Maintenance
    • Consulting
    • Commissioning Services
    • Owner Representation
  • Notable Projects
    • Education experience
    • Healthcare Experience
    • Aviation Experience
    • Gaming Experience
    • Tenant Improvement
  • The BRYMAX promise
  • Careers with BRYMAX
  • BRYMAX News and events
  • Brymax gives back

CAL STATE FULLERTON MCCARTHY HALL

Fullerton, CA  (2021)   


This modern transformation provided a full scale upgrade to the second floor of the building, which includes both faculty and student areas as well as dedicated learning centers.     


The second floor laboratory now comes equipped with with first floor fire rating upgrades, one DOAS unit, (39) Lab Valves, (41) VAV's, (5) Duct Silencers, (23) FSD's, (4) Fan Coils, (4) AC Units, (1) Humidifier,  and required a whopping 28426 lbs. of Galvanized Duct work and 17073 lbs. of stainless steel ductwork.

BRYMAX Construction Services Inc.

Serving the greater Los Angeles county since 2015

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept