Los Angeles International Airport has become home to BRYMAX's biggest impact to date, with ongoing projects across multiple terminals commencing two years ago. Our team is active on site, meeting deadlines and project specifications and partnering with several different unions and companies in order to complete the project. Below are several projects we wish to highlight in order to demonstrate our proven and tested abilities working in airports and the aviation industry.






Los Angeles, CA (2021)
Modernize, upgrade and connect Terminal 2, 3 and TBIT.
HVAC System to include the following: Custom built Air Handling Units supported by a new Chilled Water System Custom Fan Coil Units Custom CRAC units Custom Supply Fans Custom Exhaust Fans controlled and integrated back at the Central Utility Plant.

Los Angeles, CA (2020)
Preconstruction assistance (including as-built conditions, phasing plans, equipment evaluations) to support design development of Terminal 4/5 Redevelopment program. Early Work and enabling construction scope also included in this contract for major Terminal Structure Strengthening, PBB Decentralization Tenant Relocations and BHS Manual Encoder.

Santa Ana, CA (2019)
Survey, identification, material procurement and corrections / installations for existing utility seismic retrofit. Seismic bracing corrections were performed at over 1300 locations.

Los Angeles, CA (2018 - 2019)
Renovation of Hold room 12A at the concourse Level including the build-out of a 2400 SF Flight Ops facility and an approximately 4300 SF in-flight facility on the East Office Level of Terminal 1.

Los Angeles, CA (2018-2019)
Renovation and expansion of Line Maintenance facilities located in Operations Level.

Los Angeles, CA (2017 - 2018)
HVAC equipment procurement for Midfield Satellite Concourse Energy Labs.

Los Angeles, CA (2017-2018)
HVAC Equipment procurement for Delta Airlines Terminal 2/3 PH. 0.

Brymax Mechanical Services delivers complete HVAC and mechanical solutions for commercial buildings, office properties, and retail environments. Design, engineering, fabrication, installation, and service under one roof — fewer handoffs, tighter schedules, one team accountable.
WHAT WE DELIVER
Design-Build & Engineering — Concept through commissioning, engineered in-house.
New Construction & TI — Office, retail, big-box, and mixed-use; fast-track build-outs in occupied space.
Service, Retrofit & Energy: Equipment swaps, controls upgrades, PM, and 24/7 response
Built for commercial schedules. We work around tenants, store hours, and hard deadlines
*Photo: Danny Sandler for DPR Construction / Walnut Water District



BRYMAX builds and upgrades data centers. Our Data Center Team has been designing and building HVAC, plumbing, and critical services systems for a wide range of companies since the 1990s. We work on both new and existing facilities and server rooms, including the power, cooling, and backup generators that keep the equipment running.
We work closely with owners, general contractors, and trusted trade partners to deliver projects efficiently and safely. Because these facilities cannot afford downtime, we replace critical power and cooling equipment while maintaining uninterrupted operations.
Our approach begins with the end in mind. By planning backward from the required occupancy date, ordering long-lead equipment early, and testing systems throughout the project, we keep schedules on track. Consistent leadership from the same project manager and site supervisor ensures clear communication, accountability, and seamless execution from groundbreaking to turnover.
Most of our projects are covered by non-disclosure agreements, so client names and project details are shared only where permitted.
BRYMAX has a long-standing history of completing projects in higher education, including Caltech and Cal State Fullerton. From laboratory renovations to tenant improvement projects, our team can adeptly navigate bustling universities and deal with the unique work environment. Below are some professional highlights exemplifying our field specific work experience.





Pasadena, CA
This new three-story, 75,000 SF research and instruction laboratory houses a transmission electron microscope suite, a Satellite Development Assembly Room, and state-of-the-art fermentation, genetic mutation, and wet chemistry labs. Building systems apply innovative water conservation, waste reduction, and recycling technologies. Low embodied carbon materials and 50 new trees for carbon sequestration will sharply reduce the Resnick Center's carbon footprint. Construction began April 2022, with completion in 2024 for students and interdisciplinary study.

Fullerton, CA (2021)
This modern transformation provided a full-scale upgrade to the second floor of the building, which includes both faculty and student areas as well as dedicated learning centers. The second-floor laboratory now comes equipped with first floor fire rating upgrades, one DOAS unit, (39) Lab Valves, (41) VAV's, (5) Duct Silencers, (23) FSD's, (4) Fan Coils, (4) AC Units, (1) Humidifier, and required a whopping 28426 lbs. of Galvanized Duct work and 17073 lbs. of stainless-steel ductwork.

Pasadena, CA
A ground-up 71,000 sq. ft. office and laboratory facility, including an early work package to demolish and reroute existing site utilities. The labs are purpose-built for highly sensitive Laser Interferometer Gravitational-Wave Observatory (LIGO) instrumentation used to detect cosmic gravitational waves. Offices are served by a new VAV system tied to the campus chilled water loop, with a new heat exchanger on campus steam for heating hot water. Lab airflow is controlled by Accutrol high-precision supply and exhaust valves with dedicated air handlers, and the laser optical enclosures have their own air handling unit with humidification and electric reheat for precise temperature and humidity control. Anticipated completion is late 2026.
BRYMAX possesses the experience and unique skillset to accomplish projects in gaming and hospitality venues and ensure the parameters unique to these destinations are met and respected.
Our field team has completed projects both large and small in scale and through years of success acquired unique perspectives and insights into how to ensure a flawless and timely HVAC installation.



Palm Springs, CA (2021)
Design and construction to convert existing restaurant into a 9700 square foot Sports Bar. Design was based on engineered re-use of existing systems and utilities to maximize OSA delivered to space and maintain owners aggressive schedule and budget.

Cathedral City, CA (2019 - 2020)
100,000 square foot casino with 35,000 square feet of gaming floor, full restaurant with kitchen, and back of house support areas. 100% OSA air handing Units with Energy Recovery wheels utilized in gaming area served by water cooled central plant.

San Bernardino, CA (2019)
Renovation of 34,000 square feet of multiple spaces in live casino including restaurant with full kitchen, high end finish, High Limit Slot and High Limit Table gaming areas, and retail spaces.
Navigating the ins-and-outs of completing a project within the healthcare industry requires insight into its operations and strict procedures, and BRYMAX possesses the invaluable lessons learned throughout the COVID-19 pandemic to carefully and diligently go about successful construction projects.




Los Angeles, CA (2021)
Project was a 90-bed Covid-19 emergency response alternate care facility. Structure was a Sprung Structure constructed at White Memorial Hospital in Los Angeles. Project consisted of (4) package AC DOAS Units, (4) main Exhaust fans with HEPA Filtration and pressure controls for Isolation rooms. Entire project was designed and built in less than 56 days.

Inland Empire, CA (2025)
Brymax Mechanical Services partners directly with healthcare owners to deliver HCAI Classification Alignment (OSHPD-compliant) mechanical engineering design and project support — currently supporting United Healthcare from concept through approval.

UHS Canyon Ridge Hospital (2025)

UHS Corona Valley Hospital (2025)

UHS Temecula Valley Hospital (2025)

Brymax designs and builds mechanical systems for hotels and restaurants — guestroom PTAC, VTAC, and fan coil replacement programs, chiller and boiler plant retrofits, VRF conversions, kitchen exhaust and make-up air, ballroom and spa air handling, and the building automation that ties it together.
Our professional engineers are on staff, which means load calculations, equipment selection, energy code compliance, and P.E. stamped drawings all come from the same
firm that installs the work — one point of accountability, from design through startup, commissioning, and warranty.
Most of our hospitality work happens while the doors are open, so we phase floor by floor, keep temporary heating and cooling in place, tie in overnight, and turn the space over guest-ready before the next shift. Because pre-opening and seasonal dates never move,
we build the schedule around them.
Walk the property with us and gain clear insight into the design, cost, and schedule.